How is construction going on this? Is the bike lane still open? Will be down in March and hate that we will have to go 98 to Grayton.
Replies
4Beach Fanatic
I haven't eyeballed it lately but guessing it's only half way there.
Moderator
I'd be interested in the timeline. As usual, the Seaside half marathon plans on heading right down 30A. They buttoned up the last bridge they replaced right before the race. Assuming there will be the same push or a plan B by the race organizers.
Beach Fanatic
Bike path is still closed. The bridge decking is down and they are working on the road leading up to the bridge. I heard they were supposed to be done by the end of the month.
Beach Fanatic
Bike path is still closed. The bridge decking is down and they are working on the road leading up to the bridge. I heard they were supposed to be done by the end of the month.Thanks! I was way off lol.